Scheduled power interruptions: April 22-29

(CUC) — The Commonwealth Utilities Corp. would like to inform the general public that there will be scheduled power interruptions on the following dates, times and locations:

Monday, April 22

8:30 a.m. to 4:30 p.m.

  • • Outage type: Sectionalized feeder outage on the Kiya 1 distribution circuit
  • • Project Village location: Obyan
  • • Power Service area(s) affected: Torres Farm
  • • Water service are(s) affected: Obyan
  • • Water service will be interrupted during the power outage period for: None
  • • Wastewater lift station(s) affected: None
  • • Work to be performed: Replace 10 wooden poles with concrete poles

Tuesday, April 23

8:30 a.m. to 12:30 p.m.

  • • Outage type: Sectionalized feeder outage on the Kiya 1 distribution circuit
  • • Project Village location: Obyan
  • • Power service area(s) affected: Obyan
  • • Water service area(s) affected: Obyan
  • • Wastewater service area(s) affected: None
  • • Work to be performed: Replace seven wooden poles with concrete poles

Tuesday, April 23

1 p.m. to 6 p.m.

  • • Outage type: Sectionalized lateral outage on the Kiya 4 distribution circuit
  • • Project Village location: Chalan Kanoa
  • • Power service area(s) affected: Mount Carmel Cathedral Church
  • • Water service area(s) affected: None
  • • Wastewater service area(s) affected: None
  • • Work to be performed: Replace two wooden poles with concrete poles

Wednesday, April 24

8:30 a.m. to 12:30 p.m.

  • • Outage type: Sectionalized feeder outage on the Kiya 1 distribution circuit
  • • Project Village location: Obyan
  • • Power service area(s) affected: Obyan
  • • Water service area(s) affected: None
  • • Wastewater service area(s) affected: None
  • • Work to be performed: Replace two wooden poles with concrete poles

Wednesday, April 24

8 a.m. to 4 p.m.

  • • Outage type: Sectionalized lateral outage on the Feeder 4 distribution circuit
  • • Project Village location: Kagman III
  • • Power service area(s) affected: Lalanghita Road, Kagman III
  • • Water service area(s) affected: Entire Kagman area will be affected dependent on water tank level
  • • Wastewater service area(s) affected: None
  • • Work to be performed: Replace five wooden poles with concrete poles

Saturday, April 27

8 a.m. to 4 p.m.

  • • Outage type: Sectionalized feeder outage on the Feeder 4 distribution circuit
  • • Project Village location: Kagman
  • • Power service area(s) affected: Kagman 1, Kagman 2, Kagman 3 and Kagman 4
  • • Water service area(s) affected: Kagman, Papago and San Vicente
  • • Wastewater service area(s) affected: None
  • • Work to be performed: Replace seven wooden poles with concrete poles

Saturday, April 27

8 a.m. to 4 p.m.

  • • Outage type: Sectionalized feeder outage on the Kiya 1 distribution circuit
  • • Project Village location: San Vicente
  • • Power service area(s) affected: San Vicente and Papago
  • • Water service area(s) affected: San Vicente, Papago and Portions of Dandan
  • • Wastewater service area(s) affected: None
  • • Work to be performed: Replace seven wooden poles with concrete poles

Sunday, April 28

8 a.m. to 4 p.m.

  • • Outage type: Sectionalized feeder outage on the Kiya 4 distribution circuit
  • • Project Village location: Susupe
  • • Power service area(s) affected: Beach Road, Susupe (NMI District Court House to Mount Carmel Church)
  • • Water service area(s) affected: None
  • • Wastewater service area(s) affected: A-5, A-6, A-9 and A-11
  • • Work to be performed: Replace seven wooden poles with concrete poles

Monday, April 29

8 a.m. to 4 p.m.

  • • Outage type: Sectionalized feeder outage on the Feeder 4 distribution circuit
  • • Project Village location: Kagman III
  • • Power service area(s) affected: Lalanghita Road, Kagman III
  • • Water service area(s) affected: Entire Kagman area will be affected dependent on water tank level
  • • Wastewater service area(s) affected: None
  • • Work to be performed: Replace five wooden poles with concrete poles

The purpose of the scheduled power interruptions is to de-energize utility lines and allow power line workers from CUC and its contracting company, Primary Source Electric, the ability to safely replace 52 wooden poles with concrete poles in the aforementioned areas. The ongoing pole replacement projects are a result of CUC’s FEMA Water Mitigation Project and the ongoing restoration efforts following Super Typhoon Yutu.

Because of the scale of work that will be performed, CUC asks travelers to take alternate routes or to exercise caution when driving through the working area.

For more information, contact the CUC Customer Call Center at 664-4282 or monitor its Facebook page for the latest updates (https://www.facebook.com/CommonwealthUtilitiesCorporation/).