Scheduled power service interruptions on June 12, 13, 15, 18, 20

(Commonwealth Utilities Corporation) — There  will  be scheduled  power  service interruptions on June 12, 13, 15, 18, and 20, 2024.

Wednesday, June 12

Power service interruption time: 8:30 a.m. to 12:30 p.m.

• Areas affected: Saipan Ice

• Water wells affected: None

• Wastewater facilities affected: None

• Traffic lights affected: Saipan Ice Traffic Light

Momentary power service interruption time: 8:30 a.m. to 9 a.m. and 12 p.m. to 12:30 p.m.

• Areas affected: Lower Base, Tanapag, Achugao, San Roque, and As Matuis

• Water wells affected: MQ Wells (Water services to Tanapag, Achugao, San Roque, and As Matuis may be affected based on tank levels.)

• Wastewater facilities affected: T-1 and T-2

•  Traffic lights affected: Saipan Ice Traffic Light

• Purpose: To allow CUC linemen to replace a 45-foot wooden power pole with a 45-foot concrete pole, reinstall three-phase bank transformers and service drops.

Thursday, June 13

• Power service interruption time: 8:30 a.m. to 12:30 p.m.

• Areas affected: Portion of Chalan Tun Antonio Apa (NMC housing and a portion of NMC) and Bobolong Loop

• Water wells affected: None

• Wastewater facilities affected: W-8

•  Traffic lights affected: None

•  Purpose: To allow CUC linemen to replace a 40-foot leaning wooden power pole.

Saturday, June 15

• Power service interruption time: 6:30 a.m. to 1:30 p.m.

• Areas affected: Barney’s Pizza, Sunshine Garden, Ming Ming Supermarket

• Water wells affected: None

• Wastewater facilities affected: None

•  Traffic lights affected: None

•  Purpose: To allow CUC linemen to replace two 40-foot wooden power poles with 40-foot concrete poles, and reinstall three-phase bank transformers and service drops.

Tuesday, June 18

• Power service interruption time: 8:30 a.m. to 12:30 p.m.

• Areas affected: San Antonio and Afetnas

• Water wells affected: None

• Wastewater facilities affected: A-2 and A-3

• Traffic lights affected: None

•  Purpose: To allow CUC linemen to replace a 45-foot  concrete  pole with  a  35-foot wooden pole and re-attach a conduit riser.

Thursday, June 20

Power service interruption time: 6 a.m. to 2 p.m.

• Areas affected: Garapan

• Water wells affected: None

• Wastewater facilities affected: S-5

•  Traffic lights affected: None

Momentary power service interruption time: 6 a.m. to 6:30 a.m. and 1:30 p.m. to 2 p.m.

• Areas affected: Garapan

• Water wells affected: None

• Wastewater facilities affected: S-5

• Traffic lights affected: None

•  Purpose: To allow CUC linemen to replace a 45-foot wooden power pole with a 40-foot concrete pole and re-attach underground hv cable risers.

CUC appreciates the public’s cooperation and understanding as it works to ensure reliable service for its customers. For more information, contact the hotline at (670) 236-4333, visit https://www.cucgov.org or CUC’s Facebook page.