(Commonwealth Utilities Corporation) — The power interruption originally scheduled for Monday, Feb. 12, 2024, was moved to Tuesday, Feb. 27, 2024 while the initially scheduled interruption for Tuesday, Feb. 27, 2024, will be rescheduled to a later date.
Tuesday, Feb. 27, 2024
Power service interruption time: 8:30 a.m. to 2:30 p.m.
Areas affected: San Antonio (Hiyok St., Gatdas Ave., and Hakmang Ave.)
Water wells affected: None
Wastewater facilities Affected: None
Traffic lights affected: None
Purpose: To allow CUC linemen to replace a 45-foot concrete pole with a 40-foot concrete pole and replace a 45-foot wooden power pole with a 40-foot concrete pole
Wednesday, Feb. 28, 2024
Power service interruption time: 8:30 a.m. to 2:30 p.m.
Areas affected: Gualo Rai (Cheribiyan St.)
Water wells affected: None
Wastewater facilities affected: None
Traffic lights affected: None
Purpose: To allow CUC linemen to replace four 40-foot wooden power poles with concrete poles and re-install three-phase bank transformers.
Thursday, Feb. 29, 2024
Power service interruption time: 8:30 a.m. to 2:30 p.m.
Areas affected: Puerto Rico (IP&E Shell Depot)
Water wells affected: None
Wastewater facilities affected: None
Traffic lights affected: None
Purpose: To allow CUC linemen to replace five 45-foot wooden power poles with concrete poles and re-install three-phase bank transformers.
CUC appreciates the public’s cooperation and understanding as the utilities corporation works to ensure reliable service for its customers. For more information, contact the CUC hotline at (670) 236-4333, visit its website at https://www.cucgov.org or monitor its Facebook page. In case of an emergency, contact Customer Service at (670) 664-4282.