(Commonwealth Utilities Corporation) — There will be a scheduled water service interruption on Monday, Aug. 5, 2024 from 9:30 a.m. to 1 p.m.
Areas affected: As Lito to Tottotville, and portions of As Perdido and Adobu Dr. in Koblerville.

Purpose: To allow CUC water operators to repair a two-inch main service line leak located on Lt. Camacho Pl. in As Lito.
To ensure the safety of CUC crew, the southbound lane between the corner of Chalan Monsignor Rd. and Lt. Camacho Pl. will be closed. Motorists are advised to reduce speed and exercise caution while driving in the area or take alternative routes. Customers in the area will experience low to no water pressure between the specified hours. Allow one to two hours for the water lines to fully pressurize.
For more information, call (670) 236-4333, visit https://www.cucgov.org or monitor CUC’s Facebook page.


